MBE Installation
June 30, 2016
Lines for system chilled water, low-T chiller loop, rough vacuum, compressed air, nitrogen, and process gases. Ground strip with copper running all the way to the basement. Receptacles for 3 power circuits: 32A backed up (see nearby UPS), 32A not backed up, and 56A not backed up for e-beam. Also see receptacle for conduit running to backing pump in adjacent room.
December 15, 2016
Crates arrive! Advice to my future self: Never try to ship an MBE internationally just before Christmas.
January 9, 2017
Cryo baffle ahead of main pump:
Chamber inside showing shields:
Wide range gauge:
QCM in its load lock:
QCM linear translation:
K-cell:
RHEED gun:
Top-down view showing shields and e-beam:
RGA filament:
E-beam flange: